It looks like you're offline.
Open Library logo
additional options menu
Last edited by MARC Bot
December 16, 2022 | History

American Welding Society

We need a photo of American Welding Society

organization

152 works Add another?

Sorting by Sorted by: Most Editions | First Published | Most Recent | Top Rated | Reading Log | Random

Showing all works by author. Would you like to see only ebooks?

  • Cover of: Specification for Zirconium & Zirconium Alloy Welding Electrodes & Rods (A5.24-90) (ANSI/Aws)

    My Reading Lists:

    Create a new list

    Check-In

    ×Close
    Add an optional check-in date. Check-in dates are used to track yearly reading goals.
    Today
  • Cover of: Specifications for design, construction, alteration and repair of highway and railway bridges by fusion welding.

    My Reading Lists:

    Create a new list

    Check-In

    ×Close
    Add an optional check-in date. Check-in dates are used to track yearly reading goals.
    Today
  • Cover of: Standard for Brazing Procedures & Performance Qualification (B2.2-85) (Aws)

    My Reading Lists:

    Create a new list

    Check-In

    ×Close
    Add an optional check-in date. Check-in dates are used to track yearly reading goals.
    Today
  • Cover of: Standard Methods for Mechanical Testing of Welding (Code B40-77)

    My Reading Lists:

    Create a new list

    Check-In

    ×Close
    Add an optional check-in date. Check-in dates are used to track yearly reading goals.
    Today
  • Cover of: Structural Welding Code

    My Reading Lists:

    Create a new list

    Check-In

    ×Close
    Add an optional check-in date. Check-in dates are used to track yearly reading goals.
    Today
  • Cover of: Structural Welding Code--Steel

    My Reading Lists:

    Create a new list

    Check-In

    ×Close
    Add an optional check-in date. Check-in dates are used to track yearly reading goals.
    Today
  • Cover of: Structural Welding Code-Steel/D1.186

    My Reading Lists:

    Create a new list

    Check-In

    ×Close
    Add an optional check-in date. Check-in dates are used to track yearly reading goals.
    Today
  • Cover of: Tentative specifications for iron and steel gas-welding rods.

    My Reading Lists:

    Create a new list

    Check-In

    ×Close
    Add an optional check-in date. Check-in dates are used to track yearly reading goals.
    Today
  • Cover of: Addenda to D1.0-66: Code for welding in building construction and SRI-65 gas metal -arc welding with carbon dioxide shielding.  Prepared by AWS Structural Welding Committee under the direction of AWS Technical Activities Committee.  Edward Fenton, technical director.

    My Reading Lists:

    Create a new list

    Check-In

    ×Close
    Add an optional check-in date. Check-in dates are used to track yearly reading goals.
    Today
  • Cover of: Addenda to D2.0-66: Specifications for welded highway and railway bridges and SRI-65 gas metal-arc welding with carbon dioxide shielding.  Prepared by AWS Structural Welding Committee, under the direction of AWS Technical Activities Committee.  Edward A. Fenton, technical director.

    My Reading Lists:

    Create a new list

    Check-In

    ×Close
    Add an optional check-in date. Check-in dates are used to track yearly reading goals.
    Today
  • Cover of: The A.W.S. bibliographies, 1937-1967.: Compiled by Edward A. Fenton.  3d ed., superseding 1962 ed.

    My Reading Lists:

    Create a new list

    Check-In

    ×Close
    Add an optional check-in date. Check-in dates are used to track yearly reading goals.
    Today
  • Cover of: Index of welding standards from 23 nations.: [2d ed.] Compiled from Commission VII documents of the IIW.

    My Reading Lists:

    Create a new list

    Check-In

    ×Close
    Add an optional check-in date. Check-in dates are used to track yearly reading goals.
    Today
  • Cover of: Specifications for welded highway and railway bridges.: Prepared by AWS Structural Welding Committee, under the direction of AWS Technical Activities Committee.  Technical director: Edward A. Fenton.

    My Reading Lists:

    Create a new list

    Check-In

    ×Close
    Add an optional check-in date. Check-in dates are used to track yearly reading goals.
    Today
  • Cover of: Standard qualification procedure (tentative)  Prepared by the Committee on Standard Qualification Procedure and Committee on Grouping of Materials for Procedure and Operator Qualification, approved by Executive Committee, April 25, 1941.

    My Reading Lists:

    Create a new list

    Check-In

    ×Close
    Add an optional check-in date. Check-in dates are used to track yearly reading goals.
    Today
  • Cover of: Standard rules for field welding of steel storage tanks.: Prepared by Committee on Rules for Field Welding of Storage Tanks, approved by Board of Directors, August 31, 1955.

    My Reading Lists:

    Create a new list

    Check-In

    ×Close
    Add an optional check-in date. Check-in dates are used to track yearly reading goals.
    Today
  • Cover of: Tentative specification for surfacing welding rods and electrodes

    My Reading Lists:

    Create a new list

    Check-In

    ×Close
    Add an optional check-in date. Check-in dates are used to track yearly reading goals.
    Today
  • Cover of: Tentative specification for titanium and titanium alloy bare welding rods and electrodes [by] American Welding Society [and] American Society for Testing and Materials.: AWS A5.16-t; ASTM B382-61t

    My Reading Lists:

    Create a new list

    Check-In

    ×Close
    Add an optional check-in date. Check-in dates are used to track yearly reading goals.
    Today
  • Cover of: Tentative specification for welding rods and covered electrodes for welding cast iron

    My Reading Lists:

    Create a new list

    Check-In

    ×Close
    Add an optional check-in date. Check-in dates are used to track yearly reading goals.
    Today
  • Cover of: Tentative specifications for copper and copper-alloy welding rods

    My Reading Lists:

    Create a new list

    Check-In

    ×Close
    Add an optional check-in date. Check-in dates are used to track yearly reading goals.
    Today
  • Cover of: Tentative specifications for iron and steel gas-welding rods

    My Reading Lists:

    Create a new list

    Check-In

    ×Close
    Add an optional check-in date. Check-in dates are used to track yearly reading goals.
    Today
We need a photo of American Welding Society

organization

Lists

ID Numbers

Links (outside Open Library)

No links yet. Add one?

Alternative names

History

Download catalog record: RDF / JSON
December 16, 2022 Edited by MARC Bot add entity_type=org and remote_ids
August 7, 2022 Edited by MARC Bot remove spaces from ISNI
September 29, 2021 Edited by wolfgang8741 add wikidata, viaf, isni, alternative names
November 21, 2010 Edited by Alan Millar merge authors
April 1, 2008 Created by an anonymous user initial import