Obtaining life-cycle cost-effective facilities in the Department of Defense

Obtaining life-cycle cost-effective facilitie ...
Constantine Samaras, Constanti ...
Not in Library

My Reading Lists:

Create a new list

Check-In

×Close
Add an optional check-in date. Check-in dates are used to track yearly reading goals.
Today


Buy this book

Last edited by MARC Bot
September 16, 2024 | History

Obtaining life-cycle cost-effective facilities in the Department of Defense

Key findings -- Acknowledgments -- Glossary -- Introduction -- Legislative background on life-cycle cost analysis for military construction -- Study motivation and research approach -- Outline of this report -- DoD facility development, construction and operating process and barriers to -- Life-cycle cost-effectiveness -- Incentives and barriers to life-cycle cost-effectiveness at each step of the military -- Construction process -- Role of building codes in determining construction material -- The role of the international building code and building types -- Tradeoffs between annual O & M costs and initial capital costs -- Conclusions and observations -- DoD is currently incorporating life-cycle costing in many aspects of the MILCON -- Process -- Challenges in obtaining life-cycle cost effective facilities -- Observations and potential improvements -- Appendix A: RAND interview protocol used in this research -- Appendix B: Navy MILCON team planning and programming process diagram -- Appendix C: Sample U.S. Army DD Form 1391, from USACE.

Publish Date
Language
English
Pages
59

Buy this book

Edition Availability
Cover of: Obtaining life-cycle cost-effective facilities in the Department of Defense
Obtaining life-cycle cost-effective facilities in the Department of Defense
2013, RAND National Defense Research Institute
in English

Add another edition?

Book Details


Table of Contents

Summary
Key findings
Acknowledgments
Glossary
Introduction
Legislative background on life-cycle cost analysis for military construction
Study motivation and research approach
Outline of this report
DoD facility development, construction and operating process and barriers to
Life-cycle cost-effectiveness
Incentives and barriers to life-cycle cost-effectiveness at each step of the military
Construction process
Role of building codes in determining construction material
The role of the international building code and building types
Tradeoffs between annual O&M costs and initial capital costs
Conclusions and observations
DoD is currently incorporating life-cycle costing in many aspects of the MILCON
Process
Challenges in obtaining life-cycle cost effective facilities
Observations and potential improvements
Appendix A: RAND interview protocol used in this research
Appendix B: Navy MILCON team planning and programming process diagram
Appendix C: Sample U.S. Army DD Form 1391, from USACE.

Edition Notes

"RR-196-OSD" -- Page 4 of cover.

Includes bibliographical references (pages 53-59).

Published in
Santa Monica, CA

Classifications

Dewey Decimal Class
355.7068/1
Library of Congress
UC46 .S26 2013

The Physical Object

Pagination
xix, 59 pages
Number of pages
59

ID Numbers

Open Library
OL31131331M
ISBN 13
9780833079350
LCCN
2013008044
OCLC/WorldCat
829739242

Community Reviews (0)

Feedback?
No community reviews have been submitted for this work.

Lists

This work does not appear on any lists.

History

Download catalog record: RDF / JSON / OPDS | Wikipedia citation
September 16, 2024 Edited by MARC Bot import existing book
September 18, 2021 Edited by ImportBot import existing book
November 13, 2020 Created by MARC Bot Imported from Library of Congress MARC record