Check nearby libraries
Buy this book
Key findings -- Acknowledgments -- Glossary -- Introduction -- Legislative background on life-cycle cost analysis for military construction -- Study motivation and research approach -- Outline of this report -- DoD facility development, construction and operating process and barriers to -- Life-cycle cost-effectiveness -- Incentives and barriers to life-cycle cost-effectiveness at each step of the military -- Construction process -- Role of building codes in determining construction material -- The role of the international building code and building types -- Tradeoffs between annual O & M costs and initial capital costs -- Conclusions and observations -- DoD is currently incorporating life-cycle costing in many aspects of the MILCON -- Process -- Challenges in obtaining life-cycle cost effective facilities -- Observations and potential improvements -- Appendix A: RAND interview protocol used in this research -- Appendix B: Navy MILCON team planning and programming process diagram -- Appendix C: Sample U.S. Army DD Form 1391, from USACE.
Check nearby libraries
Buy this book
Edition | Availability |
---|---|
1
Obtaining life-cycle cost-effective facilities in the Department of Defense
2013, RAND National Defense Research Institute
in English
0833079352 9780833079350
|
aaaa
Libraries near you:
WorldCat
|
Book Details
Table of Contents
Edition Notes
"RR-196-OSD" -- Page 4 of cover.
Includes bibliographical references (pages 53-59).
Classifications
The Physical Object
ID Numbers
Community Reviews (0)
Feedback?History
- Created November 13, 2020
- 3 revisions
Wikipedia citation
×CloseCopy and paste this code into your Wikipedia page. Need help?
September 16, 2024 | Edited by MARC Bot | import existing book |
September 18, 2021 | Edited by ImportBot | import existing book |
November 13, 2020 | Created by MARC Bot | Imported from Library of Congress MARC record |