Pre-feasibility study on the setting up of glass industry

based on locally available raw materials at Mianwali and Khushab areas

Pre-feasibility study on the setting up of gl ...
Zaman Ullah., Zaman Ullah.
Not in Library

My Reading Lists:

Create a new list

Check-In

×Close
Add an optional check-in date. Check-in dates are used to track yearly reading goals.
Today


Buy this book

Last edited by MARC Bot
September 22, 2024 | History

Pre-feasibility study on the setting up of glass industry

based on locally available raw materials at Mianwali and Khushab areas

This edition doesn't have a description yet. Can you add one?

Publish Date
Publisher
s.n.]
Language
English
Pages
38

Buy this book

Book Details


Edition Notes

At head of title: Prime Minister's directive.

Published in
[Lahore?

Classifications

Dewey Decimal Class
338.4/76661/0954914
Library of Congress
TP854.P18 Z35

The Physical Object

Pagination
38 leaves ;
Number of pages
38

ID Numbers

Open Library
OL4394082M
LCCN
78935368
OCLC/WorldCat
8667279

Community Reviews (0)

Feedback?
No community reviews have been submitted for this work.

Lists

This work does not appear on any lists.

History

Download catalog record: RDF / JSON / OPDS | Wikipedia citation
September 22, 2024 Edited by MARC Bot import existing book
October 16, 2020 Edited by MARC Bot import existing book
December 14, 2009 Edited by WorkBot link works
December 14, 2009 Edited by WorkBot link works
April 1, 2008 Created by an anonymous user Imported from Scriblio MARC record