Check nearby libraries
Buy this book
This edition doesn't have a description yet. Can you add one?
Publish Date
1985
Publisher
Sinotech Engineering Consultants, Inc. in association with P.T. Nasuma Putra Consulting Engineers
Language
English
Pages
100
Check nearby libraries
Buy this book
Subjects
Land use, Regional planning, Land settlementPlaces
Indonesia, Nanga PinohShowing 1 featured edition. View all 1 editions?
Edition | Availability |
---|---|
1
Final report SKP structure planning (phase II) WPP/SKP XIXa/D Nanga Pinoh: transmigration settlement project, West Kalimantan (package D)
1985, Sinotech Engineering Consultants, Inc. in association with P.T. Nasuma Putra Consulting Engineers
in English
|
aaaa
Libraries near you:
WorldCat
|
Book Details
Edition Notes
At head of title: Republic of Indonesia, Ministry of Transmigration, Directorate General of Settlement Preparation, Directorate of Planning and Programming.
Spine title: SKP structure planning (phase II) final report for WPP/SKP XIXa/D Nanga Pinoh.
Title on added t.p.: Structure planning (phase II) final report for WPP/SKP XIXa/D Nanga Pinoh.
"January 25, 1985."
Includes a bibliography.
s 1987 ii n.
The Physical Object
ID Numbers
Community Reviews (0)
Feedback?History
- Created May 26, 2023
- 1 revision
Wikipedia citation
×CloseCopy and paste this code into your Wikipedia page. Need help?
May 26, 2023 | Created by MARC Bot | Imported from harvard_bibliographic_metadata record |