Record ID | harvard_bibliographic_metadata/ab.bib.09.20150123.full.mrc:73823851:1201 |
Source | harvard_bibliographic_metadata |
Download Link | /show-records/harvard_bibliographic_metadata/ab.bib.09.20150123.full.mrc:73823851:1201?format=raw |
LEADER: 01201cam a22003374a 4500
001 009071206-4
005 20040401132446.0
008 030425s2003 caua 000 0 eng
020 $a0833033166 (pbk.)
035 0 $aocm52131606
040 $aABC$cABC$dAFQ$dOCLCQ
042 $apcc
043 $an-us---
050 4 $aUG638$b.H36 2003
100 1 $aHanser, Lawrence M.
245 10 $aWhat is the required level of noncontingency temporary duty for Air Force personnel? /$cLawrence M. Hanser, Maren Leed, Marc N. Elliott.
260 $aSanta Monica, Calif. :$bRAND,$c2003.
300 $aix, 55 p. :$bill. ;$c28 cm.
490 1 $aDocumented briefing/Rand Corporation ;$vDB-367-AF
500 $a"Prepared for the United States Air Force."
500 $a"Project AIR FORCE."
610 10 $aUnited States.$bAir Force$xEducation (Continuing education)
610 10 $aUnited States.$bAir Force$xPersonnel management.
700 1 $aLeed, Maren.
700 1 $aElliott, Marc N.,$d1966-
710 1 $aUnited States.$bAir Force.
710 2 $aProject Air Force (U.S.)
710 2 $aRand Corporation.
830 0 $aDocumented briefing (Rand Corporation) ;$vDB-367-AF.
988 $a20040401
906 $0OCLC