Record ID | harvard_bibliographic_metadata/ab.bib.11.20150123.full.mrc:96854408:930 |
Source | harvard_bibliographic_metadata |
Download Link | /show-records/harvard_bibliographic_metadata/ab.bib.11.20150123.full.mrc:96854408:930?format=raw |
LEADER: 00930cam a22002297a 4504
001 011128524-0
005 20070916170349.0
008 871210s1986 io b 000 0 eng
010 $a 87943188 //r88
025 $aIo 7139
035 $a(Crl)b13785874
035 0 $aocm18221087
040 $aDLC$cDLC$dCRL$dMH
043 $aa-io---
245 00 $aFinal report, SKP structure planning (phase II) WPP/SKP XXIIb/B Suhaid /$cSinotech Engineering Consultants, Inc. in association with P.T. Nasuma Putra Consulting Engineers.
260 $a[Jakarta] :$bRepublic of Indonesia, Ministry of Transmigration, Directorat[e] General of Settlement Preparation, Directorat[e] of Planning and Programming,$c[1986]
300 $a104 p. in various pagings :$bill., maps (some folded) ;$c30 cm.
500 $aMaster microform held by: DLC.
539 $as$b1987$dio$en.
710 2 $aSinotech Engineering Consultants.
988 $a20070916
906 $0DLC