Record ID | harvard_bibliographic_metadata/ab.bib.11.20150123.full.mrc:96855338:1223 |
Source | harvard_bibliographic_metadata |
Download Link | /show-records/harvard_bibliographic_metadata/ab.bib.11.20150123.full.mrc:96855338:1223?format=raw |
LEADER: 01223cam a22002537a 4504
001 011128525-9
005 20070916170349.0
008 871210s1986 io b 000 0 eng
010 $a 87943132 //r88
025 $aIo 7137
035 $a(Crl)b13785886
035 0 $aocm18224378
040 $aDLC$cDLC$dCRL$dMH
043 $aa-io---
245 00 $aFinal report SKP structure planning (phase II) WPP/SKP, XVII c/C Punjung Merakai :$btransmigration settlement project West Kalimantan (package D) /$cSinotech Engineering Consultants, Inc. in association with P.T. Nasuma Putra Consulting Engineers.
260 $a[Jakarta] :$bRepublic of Indonesia, Ministry of Transmigration, Directorat[e] General of Settlement Preparation, Directorat[e] of Planning and Programming,$c[1986]
300 $a95 p. in various pagings :$bill., maps (some folded) ;$c30 cm.
500 $aSpine title: SKP structure planning (phase II) final report WPP/SKP XVII c/C Punjung Merakai.
500 $aMaster microform held by: DLC.
539 $as$b1987$dio$en.
710 2 $aSinotech Engineering Consultants.
740 0 $aSKP structure planning (phase II) final report WPP/SKP XVII c/C Punjung Merakai$h[microform]
988 $a20070916
906 $0DLC