Record ID | ia:constructionproj0000muba |
Source | Internet Archive |
Download MARC XML | https://archive.org/download/constructionproj0000muba/constructionproj0000muba_marc.xml |
Download MARC binary | https://www.archive.org/download/constructionproj0000muba/constructionproj0000muba_meta.mrc |
LEADER: 00944cam a2200289 a 4500
001 2009045989
003 DLC
005 20130918074934.0
008 091123s2010 njua b 001 0 eng
010 $a 2009045989
015 $aGBB049463$2bnb
016 7 $a015529405$2Uk
020 $a9780470505335 (cloth : alk paper)
020 $a0470505338 (cloth : alk paper)
035 $a(OCoLC)ocn470357145
040 $aDLC$cDLC$dYDX$dUKM$dYDXCP$dCDX$dDLC
050 00 $aTH438.4$b.M83 2010
082 00 $a690.068$222
100 1 $aMubarak, Saleh A.$q(Saleh Altayeb)
245 10 $aConstruction project scheduling and control /$cSaleh Mubarak.
250 $a2nd ed.
260 $aHoboken, N.J. :$bWiley,$cc2010.
300 $axvii, 456 p. :$bill. ;$c25 cm.
504 $aIncludes bibliographical references (p. 433-443) and index.
650 0 $aConstruction industry$xManagement.
650 0 $aBuilding$xSuperintendence.
650 0 $aProduction scheduling.