Record ID | ia:draftinformation00albe |
Source | Internet Archive |
Download MARC XML | https://archive.org/download/draftinformation00albe/draftinformation00albe_marc.xml |
Download MARC binary | https://www.archive.org/download/draftinformation00albe/draftinformation00albe_meta.mrc |
LEADER: 01761cam a22003012a 4500
001 1553652
008 s1984 abc f000 0 eng d
035 $aocm41682421
040 $beng
090 $aTK 1427 A3 S631 D751 1984$bAEEN
245 00 $aDraft information requirements document :$bproposed Slave River hydroelectric project
260 $aEdmonton :$bAlberta Environment ; Ottawa :$bEnvironment Canada,$cApr. 1984
300 $aiii, 33, 28 p. ;$c28 cm.
336 $atext$btxt$2rdacontent
337 $aunmediated$bn$2rdamedia
338 $avolume$bnc$2rdacarrier
500 $a"Government contacts for more information re part 1 guidelines are: Energy Resources Conservation Board, Manager Hydro & Electric Department, Alberta Environment, Director Planning Division or Director Environmental Assessment Division"
505 0 $aPt. 1. Draft Slave River hydroelectric project application guidelines for Alberta requirements -- Pt. 2. Interim guidelines for the preparation of an environmental impact statement for a proposed Slave River hydroelectric power development / Slave River Hydro Environmental Assessment Panel.
596 $a2
650 0 $aWater resources development$xEnvironmental aspects$zSlave River (Alta. and N.W.T.)
650 0 $aEnvironmental impact statements.
651 0 $aSlave River (Alta. and N.W.T.)
710 1 $aAlberta.$bEnergy Resources Conservation Board.
710 1 $aAlberta.$bEnvironmental Assessment Division.
710 1 $aAlberta.$bDept. of the Environment.$bPlanning Division.
740 0 $aProposed Slave River hydroelectric project : draft information requirements document.
926 $aAGL_CAP$bON_SHELF$cTK 1427 A3 S631 D751 1984$dBOOK$f1
926 $aAGL_CAP$bARCHIVES$cTK 1427 A3 S631 D751 1984$dNO_LOAN$f2