It looks like you're offline.
Open Library logo
additional options menu

MARC record from Internet Archive

LEADER: 06666nam a2200841Ii 4500
001 ocn978293905
003 OCoLC
005 20170329122756.3
007 ta ||||||||||||||||||||
008 170323s2016 dcuab b f001 0 eng d
035 $a(OCoLC)978293905
037 $bBureau of Land Management, Idaho State Office, 1387 South Vinnell Way, Boise, Idaho 83709-1657
040 $aUDD$beng$erda$cUDD
043 $an-us-id$an-us-wy
049 $aUDDD$obesLAC
088 $aBLM/ID/PL-15/100
090 $aHD243.W8$bG38 2016b
245 00 $aFinal supplemental environmental impact statement and proposed land use plan amendments for segments 8 and 9 of the Gateway West 500-kV Transmission Line Project, Idaho /$clead agency : Bureau of Land Management, Department of the Interior.
246 17 $aGateway West final SEIS and proposed land use plan amendments for segments 8 and 9, Idaho
260 $a[Washington, D.C.] :$bU.S. Department of the Interior, Bureau of Land Management,$c℗♭2016.
264 1 $a[Washington, D.C.] :$bU.S. Department of the Interior, Bureau of Land Management,$c℗♭2016.
300 $a3 volumes (approximately 2,200 pages in various pagings) :$bcolor illustrations, color maps (some folded) ;$c30 cm (3rd volume is 28 x 44 cm) +$e1 computer disc (color ; 4 3/4 in.)
336 $atext$btxt$2rdacontent
337 $aunmediated$bn$2rdamedia
338 $avolume$bnc$2rdacarrier
530 $aAlso available online via EPA website (viewed March 15, 2017). Note: Downloads to individual chapters and appendices are under the heading "3. FSEIS."
504 $aIncludes bibliographical references (pages 7-1-7-21) and index.
520 3 $aOn May 7, 2007, Idaho Power Company and PacifiCorp (doing business as Rocky Mountain Power), collectively known as the Proponents, applied to the Bureau of Land Management (BLM) for a right-of-way (ROW) grant to use the National System of Public Lands for portions of the Gateway West Transmission Line Project (Gateway West or Project). The original application was revised in October 2007, August 2008, May 2009, January 2010, and August 2014 to reflect changes and refinements in their proposed Project and in response to feedback from the public regarding routing alternatives. The Plan of Development (POD) has been revised several times in response to Project changes and recommendations from the BLM, other reviewing agencies, and public comment. This supplemental environmental impact statement (SEIS) evaluates the revised proposed action for Segments 8 and 9 as stated in the application including environmental protection measures. It also examines the environmental impacts of four other route alignments and four variations. Significant impacts were identified from construction and operations of the transmission line on historical resources (historic trails), visual quality, and cumulative impacts on several resources based on past and present levels of disturbance. A framework for compensatory mitigation has been developed.
505 0 $aVolume 1 : Chapters 1 through 7 -- volume 2 : Appendices B, C, F G, H, I, J, K, and M -- volume 3 : Large format appendices (appendices A, D, E, and L) -- CD : Volumes 1-3.
500 $a"Cooperating agencies : U.S. Fish and Wildlife Service (Ecological Services Division) ; National Park Service (National Trails Office, Pacific West Region, Hagerman Fossil Beds National Monument) ; U.S. Army Corps of Engineers ; Idaho State Historic Preservation Office ; Idaho Department of Fish and Game ; the Idaho Governor's Office of Energy Resources ; City of Kuna ; Twin Falls County, Idaho"--Abstract page [unnumbered], volume 1.
500 $a"Responsible officials : Tim Murphy, BLM Idaho, State Director ; Project manager : Jim Stobaugh"--Abstract page [unnumbered], volume 1.
500 $a"October 2016"--Cover.
500 $a"BLM/ID/PL-15/100."
500 $aVolume 3 is large format and measures 28 x 44 cm.
500 $aCompact disc, located in front pocket of volume 1, contains all chapters and appendices.
610 20 $aGateway West Transmission Line Project$xEnvironmental aspects.
650 0 $aOverhead electric lines$xRight of way$zIdaho.
650 0 $aOverhead electric lines$xRight of way$zWyoming.
650 0 $aOverhead electric lines$xEnvironmental aspects$zIdaho.
650 0 $aOverhead electric lines$xEnvironmental aspects$zWyoming.
650 0 $aElectric power transmission$xEnvironmental aspects$zIdaho.
650 0 $aElectric power transmission$xEnvironmental aspects$zWyoming.
650 0 $aLand use$zIdaho$xPlanning.
650 0 $aLand use$zWyoming$xPlanning.
650 0 $aPublic lands$zIdaho$xManagement.
650 0 $aPublic lands$zWyoming$xManagement
610 27 $aGateway West Transmission Line Project.$2fast$0(OCoLC)fst01933085
650 7 $aOverhead electric lines$xRight of way.$2fast$0(OCoLC)fst01049337
650 7 $aOverhead electric lines$xEnvironmental aspects.$2fast$0(OCoLC)fst01049326
650 7 $aElectric power transmission$xEnvironmental aspects.$2fast$0(OCoLC)fst00905607
650 7 $aLand use$xPlanning.$2fast$0(OCoLC)fst00991528
650 7 $aPublic lands$xManagement.$2fast$0(OCoLC)fst01082591
651 7 $aIdaho.$2fast$0(OCoLC)fst01211709
651 7 $aWyoming.$2fast$0(OCoLC)fst01204583
700 1 $aMurphy, Tim.
700 1 $aStobaugh, Jim.
710 1 $aUnited States.$bBureau of Land Management,$elead agency.
710 1 $aUnited States.$bBureau of Land Management.$bIdaho State Office
710 2 $aU.S. Fish and Wildlife Service.$bDivision of Ecological Services.
710 1 $aUnited States.$bNational Park Service.$bNational Trails Intermountain Region.
710 1 $aUnited States.$bNational Park Service.$bPacific West Region.
710 1 $aUnited States.$bArmy.$bCorps of Engineers.
710 2 $aIdaho State Historical Society.$bState Historic Preservation Office.
710 1 $aIdaho.$bDepartment of Fish and Game.
710 2 $aIdaho Office of Energy Resources.
710 1 $aKuna (Idaho)
710 1 $aTwin Falls County (Idaho)
740 0 $aDraft supplemental impact statement for segments 8 and 9 of the Gateway West Transmission Line Project.
856 41 $3EPA (FSEIS Documentation)$uhttps://eplanning.blm.gov/epl-front-office/eplanning/planAndProjectSite.do?methodName=dispatchToPatternPage&currentPageId=53810$zElectronic resource (PDF)
994 $aC0$bUDD
920 $aBLM Library Lower Level$hHD243.W8 G38 2016b$t1$jOn the Shelf
920 $aBLM Library Lower Level$hHD243.W8 G38 2016b$t1$jOn the Shelf
920 $aBLM Library Lower Level$hHD243.W8 G38 2016b$t1$jOn the Shelf