Record ID | ia:liabilityofdesig00adam |
Source | Internet Archive |
Download MARC XML | https://archive.org/download/liabilityofdesig00adam/liabilityofdesig00adam_marc.xml |
Download MARC binary | https://www.archive.org/download/liabilityofdesig00adam/liabilityofdesig00adam_meta.mrc |
LEADER: 02175nam 2200253 a 4500
001 ocn640484732
005 20100714094344.0
008 970828s1997 vau b f000|0 eng d
040 $aCMontNP$cCMontNP$dCMontNP
100 1 $aAdametz, John J.
245 10 $aLiability of design professionals for the preparation of cost estimates.
260 $aUniversity Park :$bPennsylvinia State University ; $aSpringfield, Va. :$bAvailable from National Technical Information Service,$c1997.
300 $avii, 89 leaves ;$c28 cm.
500 $aAD-A339 915.
502 $aThesis (M.S. in Civil Engineering) Pennsylvania State University, August 1997.
504 $aIncludes bibliographical references (p. 65-67)
520 $aThis thesis presents factors relevant to determining a design professional's liability for inaccurate cost estimates. A study of the literature related to different types of estimating methods was performed to determine what other authors have stated the accuracy to be for the respective type of estimate. Standard form contract documents of the American Institute of Architects and Engineers Joint Contract Document Committee were compared to determine the design professional's duties in meeting the requirements of the contract. Appellate court cases dealing with disputes involving inaccurate cost estimates were identified and evaluated to determine the key and consistent issues and rules applied by the courts. The cases are arranged by the primary interpretation rule which was instrumental in determining the outcome. The objective is to develop a flow diagram that owners and design professionals can use as an interpretive guide to assist them in understanding their requirements and liabilities for cost estimates. By formulating this basis of understanding of requirements, the parties will be able to practice claims prevention and avoid costly litigation.
650 4 $aACCURACY.
650 4 $aCOST ESTIMATES.
650 4 $aCONSTRUCITON.
650 4 $aLITIGATION.
592 $adk/dk cc:9116 08/28/97
710 2 $aPennsylvania State University.
926 $aNPS-LIB$bDIGIPROJ$cA2242$dTHESIS$eNEVER$f1