Record ID | ia:task1waterdemand02meli |
Source | Internet Archive |
Download MARC XML | https://archive.org/download/task1waterdemand02meli/task1waterdemand02meli_marc.xml |
Download MARC binary | https://www.archive.org/download/task1waterdemand02meli/task1waterdemand02meli_meta.mrc |
LEADER: 01631nam a2200385Ia 4500
001 003981287
005 20001130162141.0
008 830623e198301 mau s000 0 eng d
035 9 $aUMA-30489374
040 $aMAS$cMAS$dWaOLN
099 $aMASS. EA 40.2:W 29/TASK 1/V.2
245 00 $aTask 1 : water demand projections :$binterim technical report.$pAppendices /$cprepared by Arthur D. Little, Inc., Bechtel Civil & Minerals, Inc., William Melia.
260 $a[Boston] :$bMetropolitan District Commission,$c1983.
300 $a219, [2] p. :$bill., maps ;$c28 cm.
490 1 $aWater supply study and environmental impact report / Metropolitan District Commission ;$v2020.
500 $a"Submitted to : Metropolitan District Commission by : Wallace, Floyd, Associates, Inc."
500 $a"January, 1983."
500 $aIncludes tables.
650 0 $aWater-supply$zMassachusetts.
650 0 $aWater use$zMassachusetts.
650 0 $aWater consumption$zMassachusetts.
700 1 $aMelia, William.
710 2 $aArthur D. Little, Inc.
710 2 $aBechtel Civil & Minerals Inc.
710 1 $aMassachusetts.$bMetropolitan District Commission.
740 0 $aWater demand projections.
810 1 $aMassachusetts.$bMetropolitan District Commission.$tWater supply study and environmental impact report ;$v2020.
852 8 $bUMDUB$cUDMAS$hMASS. EA 40.2:W 29/TASK 1/
994 $aE0$bAUM
998 $auad$b12-16-01$cm$da$eu$feng$gmau$h0
956 $aCONV$b20$c20060724$lFCL01$h1021
956 $aBATCH-UPD$b20$c20110513$lFCL01$h2147
907 $a.b30489374$b03-26-02$c11-30-00
049 $aAUN4
903