It looks like you're offline.
Open Library logo
additional options menu

MARC record from Internet Archive

LEADER: 01657cam 2200385Ia 4500
001 D10090 1383
003 dti
005 20040402162931.0
008 830728s1983 dcuad f00010 eng d
035 $aocm09751061
040 $aCBT$cCBT$dTRL
049 $aTRLL
086 0 $aTD 7.11:MA-06-0025-83-2
088 $aDOT-TSC-UMTA-83-1
090 $aHE18.5$b.A37 no., DOT-, TSC-, UMTA-, 83-1
100 10 $aBoyd, P. J.
245 10 $aWheel/rail force measurement at the Washington Metropolitan Area Transit Authority, phase II :$bvolume II : test report : final report /$cP.J. Boyd, J.P. Zaiko, W.L. Jordan.
260 0 $aWashington, DC :$bUrban Mass Transportation Administration, Office of Systems Engineering ;$aSpringfield, Va. :$bAvailable through NTIS,$c1983.
300 $a94 p. in various pagings :$bill., charts ;$c28 cm.
490 1 $aReport / Transportation Systems Center ;$vDOT-TSC-UMTA-83-1
500 $aCover title.
500 $a"June 1983."
500 $aUMTA/MA/06/0025-83/2.
500 $aPerformed by Ensco, Inc. under contract to the Transportation Systems Center.
610 20 $aWashington Metropolitan Area Transit Authority.
650 0 $aCar-wheels$xTesting.
650 0 $aElectric railroads$xCars$xTesting.
700 10 $aZaiko, J. P.
700 10 $aJordan, W. L.
710 10 $aUnited States.$bUrban Mass Transportation Administration.$bOffice of Systems Engineering.
710 20 $aEnsco, inc.
710 20 $aTransportation Systems Center.
830 0 $aReport (Transportation Systems Center) ;$vDOT-TSC-UMTA-83-1.
910 - $a10/18/83 lt/gd
920 $aHEADQUARTERS$hHE 18.5 .A37 no., DOT-, TSC-, UMTA-, 83-1$t1$jAvailable