Record ID | marc_columbia/Columbia-extract-20221130-005.mrc:294359249:1726 |
Source | marc_columbia |
Download Link | /show-records/marc_columbia/Columbia-extract-20221130-005.mrc:294359249:1726?format=raw |
LEADER: 01726fam a2200325 a 4500
001 2231241
005 20220615235040.0
008 980526s1999 nju 000 0 eng
010 $a 98008330
020 $a0130797758
035 $a(OCoLC)39261794
035 $a(OCoLC)ocm39261794
035 $9ANW0914CU
035 $a(NNC)2231241
035 $a2231241
040 $aDLC$cDLC$dOrLoB-B
050 00 $aTH438$b.D65 1999
082 00 $a690/.068$221
100 1 $aDorsey, Robert W.$0http://id.loc.gov/authorities/names/no94015261
245 10 $aCase studies in building design and construction /$cRobert W. Dorsey.
260 $aUpper Saddle River, NJ :$bPrentice Hall,$c1999.
263 $a9901
300 $a238 pages ;$c23 cm
336 $atext$btxt$2rdacontent
337 $aunmediated$bn$2rdamedia
505 00 $gCh. 1.$tThe Organization of Design and Construction --$gCh. 2.$tContractual Relations Within Project Delivery Systems --$gCh. 3.$tIllustrative Case Studies: General Contracting --$gCh. 4.$tIllustrative Case Studies: Design-Build, Construction Management, and Program Management --$gCh. 5.$tCase Studies Needing Solutions: Project Delivery Systems/Contractual Relationships; Public Sector Work --$gCh. 6.$tCase Studies Needing Solutions: Project Delivery Systems/Contractual Relationships; Private Sector Work --$gCh. 7.$tCase Studies Needing Solutions: Risk Distribution and Dispute Resolutions --$gCh. 8.$tGovernment Regulations --$gCh. 9.$tCases in Leadership --$gCh. 10.$tSummary.
650 0 $aBuilding$xSuperintendence$vCase studies.
650 0 $aBuilding$vCase studies.
650 0 $aConstruction industry$vCase studies.$0http://id.loc.gov/authorities/subjects/sh85031367
852 80 $bave$hAA3105$iD73