Record ID | marc_columbia/Columbia-extract-20221130-005.mrc:412536351:3047 |
Source | marc_columbia |
Download Link | /show-records/marc_columbia/Columbia-extract-20221130-005.mrc:412536351:3047?format=raw |
LEADER: 03047fam a2200385 a 4500
001 2320321
005 20220616021002.0
008 971118t19981998nyua b 001 0 eng
010 $a 97048609
020 $a0471119474 (cloth : alk. paper)
035 $a(OCoLC)37993433
035 $a(OCoLC)ocm37993433
035 $9APH8707CU
035 $a(NNC)2320321
035 $a2320321
040 $aDLC$cDLC$dDLC$dOrLoB-B
050 00 $aHD40$b.S549 1998
082 00 $a658.7/87$221
100 1 $aSilver, Edward A.$q(Edward Allen),$d1937-$0http://id.loc.gov/authorities/names/n78015505
245 10 $aInventory management and production planning and scheduling /$cEdward A. Silver, David F. Pyke, Rein Peterson.
250 $a3rd ed.
260 $aNew York :$bWiley,$c[1998], ©1998.
300 $axxii, 754 pages :$billustrations ;$c24 cm
336 $atext$btxt$2rdacontent
337 $aunmediated$bn$2rdamedia
500 $aRev. ed. of: Decision systems for inventory management and production planning. c1985.
504 $aIncludes bibliographical references and indexes.
505 00 $gPt. 1.$tThe Context and Importance of Inventory Management and Production Planning and Scheduling.$gCh. 1.$tThe Importance of Inventory Management and Production Planning and Scheduling.$gCh. 2.$tStrategic Issues.$gCh. 3.$tFrameworks for Inventory Management and Production Planning and Scheduling.$gCh. 4.$tForecasting --$gPt. 2.$tTraditional Replenishment Systems for Managing Individual-Item Inventories.$gCh. 5.$tOrder Quantities When Demand is Approximately Level.$gCh. 6.$tLot Sizing for Individual Items with Time-Varying Demand.$gCh. 7.$tIndividual Items with Probabilistic Demand --$gPt. 3.$tSpecial Classes of Items.$gCh. 8.$tManaging the Most Important (Class A) Inventories.$gCh. 9.$tManaging Routine (Class C) Inventories.$gCh. 10.$tStyle Goods and Perishable Items --$gPt. 4.$tThe Complexities of Multiple Items and Multiple Locations.$gCh. 11.$tCoordinated Replenishments at a Single Stocking Point.$gCh. 12.$tSupply Chain Management and Multiechelon Inventories --
505 80 $gPt. 5.$tProduction Planning and Scheduling.$gCh. 13.$tAn Overall Framework for Production Planning and Scheduling.$gCh. 14.$tMedium-Range Aggregate Production Planning.$gCh. 15.$tMaterial Requirements Planning and its Extensions.$gCh. 16.$tJust-in-Time and Optimized Production Technology.$gCh. 17.$tShort-Range Production Scheduling.$gCh. 18.$tSummary.$gApp. A.$tElements of Lagrangian Optimization --$gApp. B.$tThe Normal Probability Distribution.
650 0 $aInventory control.$0http://id.loc.gov/authorities/subjects/sh85067678
650 0 $aProduction planning.$0http://id.loc.gov/authorities/subjects/sh85107219
700 1 $aSilver, Edward A.$q(Edward Allen),$d1937-$tDecision systems for inventory management and production and planning.
700 1 $aPyke, D. F.$q(David F.)$0http://id.loc.gov/authorities/names/no96051335
700 1 $aPeterson, Rein,$d1937-$0http://id.loc.gov/authorities/names/n78009933
852 00 $boff,eng$hHD40$i.S549 1998