It looks like you're offline.
Open Library logo
additional options menu

MARC Record from Library of Congress

Record ID marc_loc_2016/BooksAll.2016.part05.utf8:104679961:1244
Source Library of Congress
Download Link /show-records/marc_loc_2016/BooksAll.2016.part05.utf8:104679961:1244?format=raw

LEADER: 01244cam a22002531 4500
001 60061389
003 DLC
005 20071122082414.0
008 840827s1960 dcu f000 0 eng
010 $a 60061389
035 $a(OCoLC)11095808
040 $aDLC$cCU$dOCoLC$dDLC
043 $an-us---
050 00 $aKF26.5$b.S625 1960a
086 0 $aY 4.Sm 1/2:W 37
110 1 $aUnited States.$bCongress.$bSenate.$bSelect Committee on Small Business.$bSubcommittee on Government Procurement.
245 10 $aCase study in subcontracting by weapon-system contractor.$bHearing before a subcommittee of the Select Committee on Small Business, United States Senate, Eighty-sixth Congress, second session, on excessive costs of the ground-support air-conditioning equipment for the B-58 bomber program. April 28, 1960.
260 $aWashington :$bU.S. Govt. Print. Off.,$c1960.
300 $aiii, 53 p. :$btables. ;$c24 cm.
530 $aAvailable also in microform in CIS US congressional committee hearings, accession number (86)S1395-11.
610 20 $aGeneral Dynamics Corporation.$bConvair Division.
610 10 $aUnited States.$bAir Force$xProcurement.
650 0 $aSubcontracting$zUnited States.
650 0 $aAir conditioning$xEquipment and supplies.