Record ID | marc_loc_updates/v40.i18.records.utf8:4958124:1652 |
Source | Library of Congress |
Download Link | /show-records/marc_loc_updates/v40.i18.records.utf8:4958124:1652?format=raw |
LEADER: 01652nam a22004697a 4500
001 2010927080
003 DLC
005 20120427162134.0
008 100420s2010 gw a b 000 0 eng d
010 $a 2010927080
015 $a10,N08$2dnb
016 7 $a1000251675$2DE-101
020 $a9783642120510 (alk. paper)
020 $a3642120512 (alk. paper)
020 $a9783642120527 (e-ISBN)
035 $a(OCoLC)ocn639152278
040 $aOHX$cOHX$dYDXCP$dNUI$dGWDNB$dNLGGC$dOCLCQ$dDLC
042 $alccopycat
050 00 $aTS155$b.P745 2010
072 7 $aTS$2lcco
082 04 $a658.5036$2DDC22ger
084 $a650$2GyFmDB
084 $a54.10$2bcl
245 00 $aProduction engineering and management under fuzziness /$cCengiz Kahraman and Mesut Yavuz (eds.).
260 $aBerlin :$bSpringer,$cc2010.
300 $axii, 563 p. :$bill. (some col.) ;$c24 cm.
490 1 $aStudies in fuzziness and soft computing,$x1860-0808 ;$vv. 252
504 $aIncludes bibliographical references and index.
650 0 $aProduction engineering.
650 0 $aEngineering$xManagement.
650 0 $aFuzzy systems.
650 07 $aProduktionssystem$2swd
650 07 $aProduktionsplanung$2swd
650 07 $aLean Production$2swd
650 07 $aIndustrial Engineering$2swd
650 07 $aFuzzy-Menge$2swd
655 7 $aAufsatzsammlung$2swd
700 1 $aKahraman, Cengiz.
700 1 $aYavuz, Mesut.
830 0 $aStudies in fuzziness and soft computing ;$vv. 252.
856 42 $uhttp://d-nb.info/1000251675/04$3Inhaltsverzeichnis
856 42 $qtext/html$uhttp://deposit.d-nb.de/cgi-bin/dokserv?id=3427631&prov=M&dok_var=1&dok_ext=htm$3Inhaltstext