Record ID | marc_western_washington_univ/wwu_bibs.mrc_revrev.mrc:313827529:1527 |
Source | Western Washington University |
Download Link | /show-records/marc_western_washington_univ/wwu_bibs.mrc_revrev.mrc:313827529:1527?format=raw |
LEADER: 01527nam 2200301ua 4500
003 CStRLIN
005 19940805000000.0
008 890505s1986 orua b f000 0 eng d
040 $aWaBeW$cWaBeW
090 $aSH173$b.A55 1986
100 1 $aPowers, Patrick D.
245 10 $aAnalysis of barriers to upstream fish migration :$ban investigation of the physical and biological conditions affecting fish passage success at culverts and waterfalls : final project report, part 4 of 4, submitted to Bonneville Power Administration /$cprepared by Patrick D. Powers and John F. Orsborn ; Albrook Hydraulics Laboratory, Department of Civil and Environmental Engineering, Washington State University.
260 $aPortland, Ore. :$bBonneville Power Administration, Division of Fish and Wildlife,$c1986.
300 $axiii, 120 p. :$bill. ;$c28 cm.
500 $a"Part of a BPA Fisheries project on the Development of new concepts in fishladder design, contract DE-A179-82BP36523, Project no. 82-14. August, 1985."
500 $aOn cover: Final report 1984.
504 $aBibliography: p. 98-99.
650 0 $aFishes$xMigration.
650 0 $aFishes$xEffect of dams on.
700 10 $aOrsborn, John F.
710 20 $aR.L. Albrook Hydraulics Laboratory.
710 10 $aUnited States.$bBonneville Power Administration.
740 01 $aDevelopment of new concepts in fishladder design.
907 $a.b13464000$bmulti$c-
902 $a070705
998 $b1$c950214$dm$ea$f-$g0
941 $aWAWC89-B1760
940 $aSH173$b.A55 1986$lGen$z090