An in-flight investigation of workload assessment techniques for civil aircraft operations

NLR TR 87119

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read
Not in Library

My Reading Lists:

Create a new list

Check-In

×Close
Add an optional check-in date. Check-in dates are used to track yearly reading goals.
Today

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read

Buy this book

Last edited by Rene C. van de Graaff
February 8, 2013 | History

An in-flight investigation of workload assessment techniques for civil aircraft operations

NLR TR 87119

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read

The report deals with an in-flight study of assessing short-term pilot workload and focuses on the problemacy of drawing conclusions from a variety of experimental measures in an airborne operational environment. Several implications are pointed out such as the dealing with mutually different outcomes, the designating of artefacts, and the problem of formulating final conclusions.
An experimental program is discussed which is based on (normal) approach conditions for fixed-wing transport aircraft. The considered measures include pilot and safety pilot ratings (McDonnell 10-point rating scale, SWAT 3x3 rating matrix), measures of pilot heart rate and measures reflecting control activity and task performance. Besides, the usefulness of two pilot-aircraft model-based assessment methods (one based on pilot control input demand and one based on crew procedural work demand) has been examined up to some detail.
The experimental tasks consisted of flying procedural approaches (with an external view occluding visor) with each experimental run starting on “downwind” approximately 10 minutes before touchdown. The task variables include
- different approach aids, that is, ILS, VOR+DME, or NDB;
- the manner of pilot control, that is automatic, manual (in case of an ILS type of approach: with or without Flight Director information), or manual with simulated trim malfunction;
- the number of crew members, that is two-man versus one-man crew.
In total, 168 approach runs were completed using the NLR Swearingen Metro II laboratory aircraft. Five (ATPL/CPL) pilots participated as subjects in the experiment. The approach runs were carried out at three international airports: Amsterdam (EHAM: ILS approaches only), Rotterdam (EHRD) and Groningen (EHGG).
The results show among other things the necessity of the use of a set of different measures to guarantee a reliable assessment. Several inherent pros and cons of different measures are discussed in detail. Finally a strategy is outlined to formulate final conclusions based on the outcomes of a variety of measures.

Publish Date
Pages
129

Buy this book

Book Details


Edition Notes

Bibliographical references: p. 57-59.

Published in
Amsterdam, The Netherlands

The Physical Object

Pagination
128 p. :
Number of pages
129
Dimensions
29 x 21 x 0.8 centimeters

ID Numbers

Open Library
OL18929024M

Community Reviews (0)

Feedback?
No community reviews have been submitted for this work.

Lists

This work does not appear on any lists.

History

Download catalog record: RDF / JSON
February 8, 2013 Edited by Rene C. van de Graaff Addition of summary by author
January 17, 2010 Edited by WorkBot add subjects and covers
December 11, 2009 Created by WorkBot add works page