Buy this book
This edition doesn't have a description yet. Can you add one?
Publish Date
1979
Language
English
Buy this book
Subjects
Coal, Electric power production, Fluidization, Sulfur contentShowing 1 featured edition. View all 1 editions?
Edition | Availability |
---|---|
1
Engineer, design, construct, test, and evaluate a pressurized fluidized bed pilot plant using high sulfur coal for production of electric power
1979, Dept. of Energy, for sale by the National Technical Information Service]
in English
|
aaaa
|
Book Details
Table of Contents
Phase I: Preliminary engineering, technology support test report, commercial fluidized long term erosion/corrosion test in a limestone kiln
Phase I: Preliminary engineering, task 4: Environmental assessment
Phase I: Preliminary engineering, commercial plant conceptual design
Phase I: Preliminary engineering, annual report for March 1, 1976 through February 28, 1977
Phase II pilot plant design plant configuration report
Phase I, preliminary engineering, quarterly report for the period September 1 to November 30, 1977
Phase I: Preliminary engineering, PFB combustor/heat exchanger rig test at Leatherhead
Phase I: Preliminary engineering, technology support test report metallurgical evaluation of heat exchanger tubes tested in the Dorr-Oliver 12" diameter atmospheric fluosolids reactor
Edition Notes
On cover: Fossil energy
Prepared for U.S. Energy Research and Development Administration contract no. EX-76-C-01-1726
Aug. 1978
The Physical Object
ID Numbers
Community Reviews (0)
Feedback?January 20, 2010 | Edited by WorkBot | add subjects and covers |
December 11, 2009 | Created by WorkBot | add works page |