100-kW metal wind turbine blade basic date, loads and stress analysis

100-kW metal wind turbine blade basic date, l ...
A. W. Cheritt, A. W. Cheritt
Locate

My Reading Lists:

Create a new list

Check-In

×Close
Add an optional check-in date. Check-in dates are used to track yearly reading goals.
Today


Buy this book

Last edited by WorkBot
January 20, 2010 | History

100-kW metal wind turbine blade basic date, loads and stress analysis

This work doesn't have a description yet. Can you add one?

Buy this book

Edition Availability
Cover of: 100-kW metal wind turbine blade basic date, loads and stress analysis
100-kW metal wind turbine blade basic date, loads and stress analysis
1975, Dept. of Energy, Division of Solar Energy, for sale by the National Technical Information Service
in English
Cover of: 100-kW metal wind turbine blade basic date, loads and stress analysis
100-kW metal wind turbine blade basic date, loads and stress analysis
1975, Dept. of Energy, Division of Solar Energy, for sale by the National Technical Information Service
in English

Add another edition?

Book Details


Edition Notes

Contract NAS 3-19235.

"Lockhead LR 27153."

Bibliography: p. 2-12.

Published in
[Washington], Springfield, Va
Series
DOE/NASA ; 9235-75/1, NASA contractor report ; NASA CR-134956, NASA contractor report -- NASA CR-134956., DOE/NASA -- 9235-75/1.

The Physical Object

Pagination
233 p. in various pagings :
Number of pages
233

ID Numbers

Open Library
OL18014120M

Community Reviews (0)

No community reviews have been submitted for this work.

Lists

This work does not appear on any lists.

History

Download catalog record: RDF / JSON
January 20, 2010 Edited by WorkBot add subjects and covers
December 11, 2009 Created by WorkBot add works page