Preliminary geotechnical evaluations: the proposed development of piers 1, 2 and 3, south Boston, Massachusetts.

My Reading Lists:

Create a new list

Check-In

×Close
Add an optional check-in date. Check-in dates are used to track yearly reading goals.
Today



Download Options

Buy this book

Last edited by ImportBot
August 8, 2012 | History

Preliminary geotechnical evaluations: the proposed development of piers 1, 2 and 3, south Boston, Massachusetts.

...a preliminary evaluation of the geotechnical aspects of foundation design and construction of a proposed mixed use development project on South Boston waterfront property bounded by Commonwealth Pier, Boston harbor, Northern Aveue and Fort Point Channel known as Planned Development Areas (PDA's) 23 and 24; gives information on site, subsurface and groundwater conditions and tide levels; includes: map of bedrock, glacial till and inorganic soils, soil profiles, schematic section for anchored bulkheads and seawalls and slope shore protection, geologic description (bedrock, glacial till, outwash deposit, marine deposit, organic soils, and miscellaneous fill) and a section on these factors as they relate to the proposed development; a copy of this item was in the BRA collection...

Publish Date
Language
English
Pages
32

Buy this book

Previews available in: English

Book Details


The Physical Object

Pagination
32 p. + figures; map, illus.
Number of pages
32

ID Numbers

Open Library
OL23367402M
Internet Archive
preliminarygeote84hale

Source records

Internet Archive item record

Community Reviews (0)

Feedback?
No community reviews have been submitted for this work.

Lists

This work does not appear on any lists.

History

Download catalog record: RDF / JSON
August 8, 2012 Edited by ImportBot import new book
April 28, 2010 Edited by Open Library Bot Linked existing covers to the work.
January 28, 2010 Edited by WorkBot add more information to works
December 11, 2009 Created by WorkBot add works page