Comprehensive report on campus high school urban renewal area.

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read

My Reading Lists:

Create a new list

Check-In

×Close
Add an optional check-in date. Check-in dates are used to track yearly reading goals.
Today

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read


Download Options

Buy this book

Last edited by ImportBot
August 3, 2012 | History

Comprehensive report on campus high school urban renewal area.

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read

...gives a brief description of the Campus High School Urban Renewal Area in Boston's Roxbury neighborhood and then goes on to describe (with cost estimates), in some detail, the necessary basic improvements to the streets, parks/playgrounds and utilities (water, sewer, police signal and fire alarm, street and park lighting, MBRA power feeder duct banks, electric, telephone and gas); includes a section on the geology of the area; Appendix A is a street condition survey, Appendix B includes, among other things, an alphabetical listing of existing streets and a list of streets to be abandoned; this item was in the BRA collection...

Publish Date
Language
English
Pages
39

Buy this book

Previews available in: English

Book Details


Edition Notes

Other Titles
Campus high school project r-129 comprehensive engineering report.

The Physical Object

Pagination
ii, 39 p. + appendices; map
Number of pages
39

ID Numbers

Open Library
OL24161698M
Internet Archive
comprehensiverep00gree

Source records

Internet Archive item record

Community Reviews (0)

Feedback?
No community reviews have been submitted for this work.

Lists

This work does not appear on any lists.

History

Download catalog record: RDF / JSON
August 3, 2012 Created by ImportBot import new book