Check nearby libraries
Buy this book
This edition doesn't have a description yet. Can you add one?
Check nearby libraries
Buy this book
Previews available in: English
Showing 1 featured edition. View all 1 editions?
Edition | Availability |
---|---|
1
Draft environmental impact report: 200-214 6th Street affordable housing with ground-floor retail
2013, Planning Dept.
in English
|
aaaa
Libraries near you:
WorldCat
|
Book Details
Edition Notes
Cover title.
"Planning Department case no. 2011.0119E."
"Draft EIR publication date: February 27, 2013; Draft EIR public hearing date: April 4, 2013; Draft EIR public comment period: February 27, 2013-April 15, 2013."
"EIR authors: Planning Department; EIR consultants: During Associates; Clement Designs; Project sponsor's team: Project sponsor: Mercy Housing Corporation; Project architect: Kennerly Architecture & Planning"--P. 109.
"The proposed project would include demolition of the existing building, and construction of a nine-story, 85-foot-tall, approximately 68,540-square-foot mixed-use building with 67 affordable rental housing units. The proposed project would include approximately 47,710 square feet of residential space, 2,845 square feet of ground-floor commercial space, a 1,215-square-foot community room, and 2,589 square feet of private and 3,691 square feet of common open space (respectively), including a rear yard and roof terrace"--P. 1.
The Hugo Hotel which was built in 1909, occupies the current site.
"A temporary site specific art installation project known as "Defenestration" [by Brian Goggin] currently adorns the exterior of the vacant building on the project site"--P. [2].
The Physical Object
ID Numbers
Community Reviews (0)
Feedback?August 4, 2014 | Created by ImportBot | import new book |