Report on the adaptability of the conclusions of the study on the feasibility of the metropolitan to the hypothesis of construction of an initial section of the first line.

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read
Report on the adaptability of the conclusions ...
Not in Library

My Reading Lists:

Create a new list

Check-In

×Close
Add an optional check-in date. Check-in dates are used to track yearly reading goals.
Today

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read

Buy this book

Last edited by MARC Bot
October 7, 2020 | History

Report on the adaptability of the conclusions of the study on the feasibility of the metropolitan to the hypothesis of construction of an initial section of the first line.

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read

This edition doesn't have a description yet. Can you add one?

Publish Date
Language
English
Pages
34

Buy this book

Book Details


Edition Notes

Based on the study prepared for the State of Guanabara by Companhia Construtora Nacional, Hochtief, Aktiengesellschaft für Hoch- und Tiefbauten, and Deutsche Eisenbahn Consulting G.m.b.H. published under title: Metrô Rio.

Published in
[Rio de Janeiro?

Classifications

Dewey Decimal Class
388.4/2/09815
Library of Congress
HE4629.R5 R46

The Physical Object

Pagination
34 l.
Number of pages
34

ID Numbers

Open Library
OL5452395M
LCCN
73154488

Community Reviews (0)

Feedback?
No community reviews have been submitted for this work.

Lists

This work does not appear on any lists.

History

Download catalog record: RDF / JSON
October 7, 2020 Created by MARC Bot import existing book