Instrumentation of the US Grant Bridge for monitoring of fabrication, erection, in-service behavior, and to support management, maintenance, and inspection

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read
Instrumentation of the US Grant Bridge for mo ...
Arthur J. Helmicki
Not in Library

My Reading Lists:

Create a new list

Check-In

×Close
Add an optional check-in date. Check-in dates are used to track yearly reading goals.
Today

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read

Buy this book

Last edited by MARC Bot
November 12, 2020 | History

Instrumentation of the US Grant Bridge for monitoring of fabrication, erection, in-service behavior, and to support management, maintenance, and inspection

  • 0 Ratings
  • 0 Want to read
  • 0 Currently reading
  • 0 Have read

The replacement of the US Grant Bridge over the Ohio River in Portsmouth, OH, was initiated in 2001 when the original bridge was closed and demolished, and its substitute opened in 2006. The new design is a steel cable stay design with steel girders and floor-beams supporting a post-tensioned concrete deck system nearly 65' wide carrying one lane of traffic in each direction. The combination of epoxy-coating, grout filling, and outer tubing provides protection for the all-important structural cabling suspension system from both weather and corrosion. Ironically, however, these same features make it impossible to gain direct access to either the cables or the interior of the anchorages which, in turn, presents special challenges for inspection and rehabilitation of these critical bridge components on bridges of this type. It was envisioned that its long-term behavior and any associated changes in its structural condition could be best understood with the aid of a longitudinal study beginning during bridge construction, one that includes instrumented monitoring of both construction/erection and in-service phases of the life of this bridge. Such an approach, integrated with traditional bridge management techniques, would help lead to a safe and economical realization of the 100-year design life of this structure. A health monitoring system for the bridge would be designed, planned, and implemented, with data collection and archival throughout its construction and ultimately an automated, user-friendly interface on a dedicated website.

Buy this book

Edition Availability
Cover of: Instrumentation of the US Grant Bridge for monitoring of fabrication, erection, in-service behavior, and to support management, maintenance, and inspection
Instrumentation of the US Grant Bridge for monitoring of fabrication, erection, in-service behavior, and to support management, maintenance, and inspection
2013, Ohio Dept. of Transportation, Research, Available through the National Technical Information Service
in English

Add another edition?

Book Details


Edition Notes

Performing organization: University of Cincinnati, Infrastructure Institute.

"Prepared for: The Ohio Department of Transportation, Office of Statewide Planning & Research"--Cover.

"December 2013."

Executive summary report (6 p.) laid in.

Includes bibliographical references.

Final report.

Also available online.

State job no. 14805

Published in
Columbus, Springfield, Va

Classifications

Library of Congress
TG385 .H45 2013

The Physical Object

Pagination
[iv], 178 p.
Number of pages
178

ID Numbers

Open Library
OL30991513M
LCCN
2013481534
OCLC/WorldCat
871712582

Community Reviews (0)

Feedback?
No community reviews have been submitted for this work.

Lists

This work does not appear on any lists.

History

Download catalog record: RDF / JSON
November 12, 2020 Created by MARC Bot import new book