Check nearby libraries
Buy this book
When this TFPPP subcontract was partially completed, Global Solar Energy (GSE) was charged with simultaneously executing a dramatic increase in production capacity, with the planning and construction of two entirely new production facilities for thin film CIGS PV (in Tucson, AZ and Berlin, Germany). The expansion was the major focus of the organization for about 24 months, and in some cases diverted resources that had been allocated to development, including this subcontract. However, since the expansion required entirely new production equipment for all phases of the thin film deposition and "back-end" operations, it also provided a unique opportunity to execute on the goals of this subcontract in ways we had not envisioned. Major improvements in cost and reliability, goals of this subcontract, could now be addressed in the design stages for the 'Gen2' plants and equipment, opening up large opportunities, and leveraging what had been learned at GSE with the existing 'Gen1' production equipment and processes.
Check nearby libraries
Buy this book
Showing 1 featured edition. View all 1 editions?
Edition | Availability |
---|---|
1
Cost and reliability improvement for CIGS-based PV on flexible substrate: May 24, 2006 - July 31, 2010
2011, National Renewable Energy Laboratory
electronic resource :
in English
|
aaaa
Libraries near you:
WorldCat
|
Book Details
Edition Notes
Title from title screen (viewed June 6, 2011).
"May 2011."
"Prepared under Subcontract No. ZXL-6-44205-13."
"NREL Technical Monitor: Harin S. Ullal."
Includes bibliographical references (p. 73).
DE-AC36-08GO28308
Full text available via Internet in .pdf format. Adobe Acrobat Reader required.
The Physical Object
ID Numbers
Community Reviews (0)
Feedback?December 13, 2022 | Created by MARC Bot | import new book |