Final report SKP structure planning (phase II) WPP/SKP XIXa/B Nanga Pinoh

transmigration settlement project, West Kalimantan (package D)

Final report SKP structure planning (phase II ...
Sinotech Engineering Consultan ...
Not in Library

My Reading Lists:

Create a new list

Check-In

×Close
Add an optional check-in date. Check-in dates are used to track yearly reading goals.
Today


Buy this book

Last edited by MARC Bot
May 26, 2023 | History

Final report SKP structure planning (phase II) WPP/SKP XIXa/B Nanga Pinoh

transmigration settlement project, West Kalimantan (package D)

This edition doesn't have a description yet. Can you add one?

Buy this book

Edition Availability
Cover of: Final report SKP structure planning (phase II) WPP/SKP XIXa/B Nanga Pinoh
Final report SKP structure planning (phase II) WPP/SKP XIXa/B Nanga Pinoh: transmigration settlement project, West Kalimantan (package D)
1984, Sinotech Engineering Consultants, Inc. in association with P.T. Nasuma Putra Consulting Engineers
in English

Add another edition?

Book Details


Edition Notes

At head of title: Republic of Indonesia, Ministry of Transmigration, Directorate General of Settlement Preparation, Directorate of Planning and Programming.

Spine title: SKP structure planning (phase II) final report WPP/SKP XIXa/B Nanga Pinoh.

Title on added t.p.: Structure planning (phase II) final report WPP/SKP XIXa/B Nanga Pinoh.

"December 1984."

Includes a bibliography.

s 1987 ii n.

Published in
Pontianak]
Other Titles
SKP structure planning (Phase II) final report WPP/SKP XIXa/B Nanga Pinoh, Structure planning (Phase II) final report WPP/SKP XIXa/B Nanga Pinoh

The Physical Object

Pagination
105 p. in various pagings
Number of pages
105

ID Numbers

Open Library
OL47957116M
LCCN
87941282
OCLC/WorldCat
20727838

Community Reviews (0)

Feedback?
No community reviews have been submitted for this work.

Lists

This work does not appear on any lists.

History

Download catalog record: RDF / JSON
May 26, 2023 Created by MARC Bot import new book