Check nearby libraries
Buy this book
"Through inventory of watersheds and a priority rating system, the Rio Puerco Resources Area, Albuquerque District has chosen the San Isidro watershed for sediment control and gully rehabilitation work. Portions of this drainage are actively headcutting and contributing sediment to downstream reservoirs and farmland on the Rio Puerco and Rio Grande. A special emphasis in the San Isidro watersheds will be on the structural treatment of small continuous gullies. This dictates that most of the structural work will occur on the upper reaches of the watershed"--Page 5.
Check nearby libraries
Buy this book
Previews available in: English
Showing 1 featured edition. View all 1 editions?
Edition | Availability |
---|---|
1
San Isidro watershed rehabilitation plan
1988, U.S. Department of the Interior, Bureau of Land Management, Albuquerque District Office
in English
- Revised edition
|
aaaa
Libraries near you:
WorldCat
|
Book Details
Table of Contents
Edition Notes
Cover title.
"Prepared March 1985, revised January 1988."
Includes bibliographical references (leaf 37).
Also available online via Internet Archive.
Photocopy.
The Physical Object
ID Numbers
Community Reviews (0)
Feedback?History
- Created January 25, 2022
- 1 revision
Wikipedia citation
×CloseCopy and paste this code into your Wikipedia page. Need help?
January 25, 2022 | Created by ImportBot | Imported from Internet Archive item record |